Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Current »

Attendees

  1. Kristofer PISTER

  2. Austin Patel

  3. David Burnett

  4. Fil Maksimovic

  5. Joshua Alexander

  6. Thomas Watteyne

Minutes

  • Fil Maksimovic

    • discussion with Austin Patel about while(1) statement, was able to get SCuM to receive more packets (OpenMote sending to SCuM)

    • Austin Patel discusses the fact that 4ms period was legacy code from working with Sarah

    • full 16-channel TX and RX calibration using OpenMotes

    • current work: working on minimalistic version of TSCH using the OpenMote

    • next: propagate calibration from one SCuM to the next

  • discussion about nRF

    • discussion about nRF PDR (dependent on packet length)

      • nRF->SCuM: 100%

      • SCuM->nRF: 25%

    • with 100B packet, nRF didn’t receive anything

    • root cause unclear, tried multiple things, no effect

      • varying 2MHz clock (chipping clock)

      • supply voltage on SCuM to below 1.8V to maybe change tone spacing

    • Kristofer PISTER the nRF can be the assistant to program and calibrate and UART interface to SCuM, but not the root of the network

  • David Burnett

    • discussion about combining different oscillators (10-100)

  • Joshua Alexander

    • about 10-100 SCuM board

    • discussion about epoxy deformation

    • some discussion with Mo and Quik-Pak

      • Mo indicated they didn’t take the board to 250C, Quik-Pak indicates epoxy holds up to 275C

      • discussion about temperature involved with putting headers on

    • Josh shares Past Sulu Assemblies

  • Thomas Watteyne

    • training for Paris half marathon

    • would like to talk about role of “team assistant”

  • No labels