/
28-Apr-2021

28-Apr-2021

Attendees

  1. @Razanne Abu-Aisheh

  2. @Thomas Watteyne

  3. @Jackson Paddock

  4. @Joshua Alexander

  5. @Said Alvarado-Marin

  6. @Kristofer PISTER

  7. @David Burnett

  8. @Martina Balbi

  9. @Fil Maksimovic

  10. @Austin Patel

Minutes

  • @Jackson Paddock

    • updates about his MsC thesis

  • @Austin Patel

    • pinout decided, 10-pin connector

      • full native connector to Teensy

      • ribbon cable to nRF52840-DK

    • goal is to ship 20x board order today ( Apr 28, 2021 ), and have the boards back by May 5, 2021

    • @Kristofer PISTER : if difference between 20x and 50x boards is low, order 50x

    • @Joshua Alexander in charge of sending out the boards

    • @David Burnett: might be open to sending a couple of boards for testing

    • @Joshua Alexander will be just the spock board

  • @Said Alvarado-Marin

    • https://youtu.be/U_WfdU7TkXU

    • Components for the DotBot 1.4 PCB arrive.

    • 3 PCBs have been assembled. (Currently none are functional)

    • 6V Step-up converter chip is presenting difficulties while soldering. (3x4 pin 3mm BGA, really hard to solder)

  • @Martina Balbi

  • @Fil Maksimovic

    • working on LH2 localization, at range of 2-4m it’s getting almost every bit

    • it works!

    • hitting PPI limit

    • @Kristofer PISTER indicates @Felipe Campos was working on calibration routine

Related content