28-Jul-2021

Attendees

  1. @Trifun Savic

  2. @Thomas Watteyne

  3. @David Burnett

  4. @Fil Maksimovic

  5. @Said Alvarado-Marin

Actions

  • full 3wb procedure with nRF-DK

  • reach out to Paris wire-bonding lab

  • figure out the Quick-Pack route for small volume quote

Minutes

  • discussiong nRF

    • UX is impacted by need to connect 2 USB cables, but workable

  • wirebonding

    • quote from local UPX company is more than Quick-Pack

  • @David Burnett

    • got SCuM digital booting on an FPGA

    • as part of work of a student on a better ADC digital

    • hard-reset needed before 3wb kicks in

    • on NEXUS 4 DDR (“A7”)