21-Jul-2021
Attendees
David Burnett
Said Alvarado-Marin
Austin Patel
Joshua Alexander
Minutes
David Burnett Trip report from visiting UCB w/ Fil Maksimovic
Facilitated by Austin Patel Sunday and via text Monday
~20 dice tested; after setup, average test time was 8 min/die with 2 people engaged in testing
Probing from opposite side of die prevents probe from touching waffle pack pocket wall and preventing pad contact
Die testing included 1.5v and 1.8v
Dice were attached to McCoy v2 via silver epoxy
Wirebonder was not cooperating; wirebonding services are being investigated
McCoy and older boards taken to Portland and Paris
Said Alvarado-Marin
New PCB, new robot w/ larger wheels, diagnosing increased current and torque requirements